Marie Reed Soccer Field

Part elementary school, part community space, the Marie Reed Center is a gathering point for the Adams Morgan Community and beyond. The center offers healthcare, adult learning, and indoor/outdoor recreation spaces. The field was originally constructed in 2013. Despite periodic maintenance, it was in need of removal and replacement.

Greening Urban provided the full scope of civil engineering services, which included an Erosion & Sediment Control set for DOEE and a DDOT traffic control plan for an Occupancy Permit. A BCIV permit was required from DOB, as well. In such a dense area, thorough traffic plans were imperative. Our plans shut down a segment of sidewalk on California Street and outlined exactly how trucks would navigate through the city to the project site.

We partnered with Atmos Solutions, Inc and DGS Capital Construction Division to complete the project. From award to final inspection, the duration of the project was just over ten months. According to the community, the soccer field is highly rated and consistently booked.

Location:

Washington, DC

Project Start Date:

October 2024

Project Completion Date:

August 2025

Client:

Atmos Solutions

Ultimate Client:

Department of General Services (DGS)

Overall Project Budget:

$903,000.00

Project Area: